A visual inspection is performed to check parts like the shaft, keyway, endbells, terminals, and connectors
-
Surge comparison test, or short test, is performed to verify if the stator will need to be rewound
-
Insulation resistance test, often called a megger test, is performed in each phase to make sure the insulation is not broken down
-
A phase balance test uses an RMS meter to ensure the windings are balanced in between phases; this is also where the brake is verified if the servo motor has one.
-
KE test follows to test the conditions of the magnets inside the servo motor
-
The final stage is using our Mitchell Electronics System, using the TI-5000; a test of the feedback device is performed on the servo motor.